
Ghana is among some developing countries that will soon get a power plant to augment their power supply needs.
Reports reaching ghanabusinessnews.com indicate that Russian state-owned Technopromexport has announced in Moscow. The reports say the Russian power plant builder and Libya's African Investment Portfolio have teamed up to form a new company, Laptechno-Power which will build and operate the power facilities.
The other countries that would benefit from the projects are Libya, Uganda, Algeria, Egypt, Yemen and Namibia.
The US$ 6.73 billion cost of the projects will be borne by Libya African Investments Portfolio. According to Technopromexport “Top priority projects for Laptechno-Power will be the construction of a 1250km electric transmission line with a capacity of 400 kW in Libya and a 300 MW hydro power plant on the Blue Nile River in Uganda.”
Technopromexport is building hydroelectric, thermal, geothermal and diesel power plants, and power transmission lines in 50 countries around the world.
Ghana has been experiencing power shortages for some time now. The country has a hydropower plant at Akosombo, but perennial water shortages in the dam affects power supply, occasionally plunging the entire country into darkness.
The country has constructed a thermal plant to supplement its power supply needs but a lot more needs to be done to meet the power supply requirement that would bolster economic growth.
By Emmanuel K. Dogbevi


Middle East live: Iran says will target any vessel traffic in Strait of Hormuz
Bill Gates calls Epstein meetings a ‘grave error’ while defending actions in hou...
Infantino defends World Cup ticket prices, dismisses referee US entry dispute
Rainstorms from Nigeria, Benin to trigger thunderstorms in Ghana — GMet warns
Accra floods: 70 seized excavators to be deployed to NADMO for desilting — Munta...
Kasseh Market executives stop sale of food near toilet facility
Three arrested over theft of critical equipment at Komenda Sugar Factory
Nearly half of Ghanaians say military rule can be justified if governments fail ...
GWL resumes production at Barekese Water Treatment Plant after completion of rep...
Economic performance most powerful source of Mahama’s goodwill — IEA