body-container-line-1

Fix Gushegu Roads

Feature Article Fix Gushegu Roads
MAR 24, 2021 LISTEN

In 20l16, the road was a bame of the NDC’S message to us to vote them to power and the never had that. To a larger extent, the Tamale-Gushegu-Karaga raod was captured as part of the composite budget of the Gushegu District Assembly.

One could therefore expect that the NPP government could be very smart to get the road fixed. Indeed the fixing of the road is long overdue.

With the current crop of great MPs who ply the road and happen to find themselves within the corridors of power, fixing the road is non-negotiable. I can remember in the 2020 election campaign season, the NDC use the standstill status of the road against the NPP and its candidates, arguing that if they were given power in 2016, they would have continued and finished up work on the road. Though, we all knew it was political.

Seemingly, there is serious work putting up by the contractors on-site and with the rains approaching, one will expect that if plans to fix the road is not fast-tracked, the story would not be different from that of the previous years. The elders have it that it serves a disgrace to the dog if a goat bites a stranger.

Yes our was to do the greatest job to campaign to have for the first time NPP winning both parliamentary and presidential election at Nanton, Karaga, and Gushegu. Yes, we delivered the three seats for the NPP so, what else!

Alas, within the four-year tenure of the NPP, if the Tamale-Gushegu-Karaga road is not fixed, that will be big to blow to the three lions on the road. A word to a wise is more than enough.

body-container-line